Geomorphological Study of the Little Pigeon Creek Floodplain for the Proposed Replacement of the Bridge over Little Pigeon Creek on S.R. 245, INDOT Project: STP 5674 0, Des. No 9620010, Spencer County, Indiana
Loading...
Can’t use the file because of accessibility barriers? Contact us with the title of the item, permanent link, and specifics of your accommodation need.
Date
2002-08
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Glenn A. Black Laboratory of Archaeology, Indiana University
Permanent Link
Abstract
At the request of the Indiana Department of Transportation., the Glenn A. Black Laboratory of Archaeology Office of Cultural Resource Management, Indiana University (GBLOCRM) has been requested to conduct Phase Ic subsurface archaeological investigations for the replacement of the bridge over Little Pigeon Creek on Indiana Highway 245 in Spencer County. The proposed project will also straighten out the path of the existing highway and a new right-of-way will be required. The area to be tested is limited to the portion of the new right-of-way that contains the Philo silt loam, an area covering approximately 8,750 m2. In the spring of 2001, GBL-OCRM archaeologist, Melody Pope, conducted a brief reconnaissance of the project area. After this initial reconnaissance, Ms. Pope discussed the project area with Mr. Jim Mohow, DHPA and it was agreed that a geomorphologic study using systematic angering should be undertaken to determine the feasibility of conducting further subsurface testing. Because of other project priorities, the Spencer geomorphologic study was put on hold. On July 11, 2002, GBL archaeologists Melody Pope and George Mankowski conducted a second reconnaissance to the project area in order to plan a testing strategy. Fieldwork was conducted July 24 and 25th 2002 by GBL archaeologists George Mankowski and Tamara Hull for the geomorphologic survey of the above described project area. It is the opinion of the GBL-OCRM that a phase Ic subsurface reconnaissance is not necessary due to the extremely limited vertical extent of the Ap and A soil horizons. Furthermore, the fact that the auger probe survey and original Ph Ia reconnaissance was negative for cultural material, it is also the opinion of the GBL-OCRM that it is unlikely that significant cultural resources will be impacted by construction, therefore clearance is recommended for the proposed bridge replacement over Little Pigeon Creek, provided that all earth-moving activities are restricted to the currently defined project area boundaries.
Description
Abstracts are made available for research purposes. To view the full report, please contact the staff of the Glenn A. Black Laboratory of Archaeology (www.gbl.indiana.edu)
Keywords
archaeological report
Citation
Mankowski, George L., and Melody K. Pope. 2002. "Geomorphological Study of the Little Pigeon Creek Floodplain for the Proposed Replacement of the Bridge over Little Pigeon Creek on S.R. 245, INDOT Project: STP 5674 0, Des. No 9620010, Spencer County, Indiana," Glenn A. Black Laboratory of Archaeology Report of Investigation 01-13
Journal
DOI
Link(s) to data and video for this item
Relation
Rights
Digital reproductions of reports from the Glenn A. Black Laboratory are made available for noncommercial, educational, and research purposes only. Copyright is reserved for the Trustees of Indiana University.
Type
Technical Report