Phase Ia Archaeological Survey for Bridge 81, Hardy Mill Road over Fourteen Mile Creek, 2.5 miles South of intersection of SR 356 and Hardy Mill Road

dc.contributor.authorMankowski, George
dc.contributor.authorPope, Melody
dc.date.accessioned2019-11-07T21:03:31Z
dc.date.available2019-11-07T21:03:31Z
dc.date.issued2002-01
dc.descriptionAbstracts are made available for research purposes. To view the full report, please contact the staff of the Glenn A. Black Laboratory of Archaeology (www.gbl.indiana.edu)en
dc.description.abstractAt the request of R.W. Armstrong & Associates, Inc., the Glenn A. Black Laboratory of Archaeology, Indiana University (GBL) conducted a Phase Ia archaeological reconnaissance survey for a bridge replacement on Hardy Mill Road over Fourteen Mile Creek (Des. No. 0088570). The project area is approximately 1.06 acres in size. A visual overview was conducted for 0.3 acres that were not tested due to slope and previous disturbance. The remaining 0.76 acres were tested by a combined shovel probe/auger probe methodology. The purposes of survey were 1) to identify and document all cultural resources in the project area, 2) to evaluate the eligibility of any sites found for inclusion on the National Register of Historic Places (NRHP) and the Indiana Register of Historic Sites and Structures (IRHSS), and 3) to make recommendations for the protection of significant and potentially significant sites. Fieldwork was conducted on December 20, 2001 and January 14, 2002 by GBL archaeologists George Mankowski, Kris Suthers, Daniel Seib, Johnie Sanders, and Krista Jordan. Only modern historical material was recovered during the archaeological survey. No significant or diagnostic artifacts were recovered during the survey. Additionally, two auger probes, placed on either side of the West Fork of Fourteen Mile Creek, indicate no evidence for deeply buried cultural deposits. Therefore, cultural resource clearance is recommended for the project area provided that all earth-moving activities are restricted to the currently defined project area boundaries.en
dc.identifier.citationMankowski, George, and Melody Pope. 2002. "Phase Ia Archaeological Survey for Bridge 81, Hardy Mill Road over Fourteen Mile Creek, 2.5 miles South of intersection of SR 356 and Hardy Mill Road," Glenn A. Black Laboratory of Archaeology Report of Investigation 01-43en
dc.identifier.urihttps://hdl.handle.net/2022/24661
dc.language.isoenen
dc.publisherGlenn A. Black Laboratory of Archaeology, Indiana Universityen
dc.relation.ispartofseriesGBL ROI;01-43
dc.rightsDigital reproductions of reports from the Glenn A. Black Laboratory are made available for noncommercial, educational, and research purposes only. Copyright is reserved for the Trustees of Indiana University.en
dc.subjectarchaeological reporten
dc.titlePhase Ia Archaeological Survey for Bridge 81, Hardy Mill Road over Fourteen Mile Creek, 2.5 miles South of intersection of SR 356 and Hardy Mill Roaden
dc.typeTechnical Reporten

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
ROI 01-43_abstract.pdf
Size:
187.81 KB
Format:
Adobe Portable Document Format
Description:
Can’t use the file because of accessibility barriers? Contact us with the title of the item, permanent link, and specifics of your accommodation need.